📋
Basic Information
Model NO.:
MDK-25091316
Material:
Aluminum, Stainless Steel, Copper, Brass
Surface Treatment:
Powder Coating, Plating, Oxide, Anodizing
Machining Method:
Laser Cutting, Bending, Welding, Stamping
Delivery Time:
1-2 Weeks / 2-4 Weeks
Production Capacity:
50000PCS/Year
📦
Expertise & Solutions
Over our 30-years industry experience, we have specialized in sheet metal fabrication, Stainless Steel metal fabrication, Aluminum metal fabrication, precision CNC parts, and variety of surface-treatments.
⭐
Quality Commitment
Equipped with state-of-the-art testing facilities and a robust technical team, we seamlessly navigate the entire process from prototyping to production, transforming your concepts into reality. Choose us for all your custom metal needs and experience End-to-End Metal Fabrication Solutions.
🏢
Production Capability
The manufacturing facility covers an area of 10,000 square meters with annual sales of 5 million USD, employing approximately 60 skilled professionals dedicated to high-quality output.
✅
International Certifications
Our management systems are fully certified with: ISO9001:2015, ISO 14001:2015, ISO20000-1:2018, ISO27001:2013, and ISO45001-2018.
❓
Frequently Asked Questions
What are your primary manufacturing processes?
Our core services include CNC Laser Cutting, CNC Punching, CNC Bending/Forming, Welding (MIG, TIG, Spot), Hardware Insertion, Grinding, and comprehensive Surface Treatments like Powder Coating and Anodizing.
What file formats do you prefer for quoting and production?
We prefer native 3D CAD files (.STEP, .IGES, .SLDPRT, .IPT). 2D drawings (.DXF, .DWG) and detailed PDFs are also accepted if they include critical dimensions and material specs.
What are your standard tolerance capabilities?
Standard Laser/Punch cutting: ± 0.127 mm. Bending/Forming: ± 0.5°. Tighter tolerances are achievable upon discussion with our engineering team.
What is the minimum flange length I can design for a bend?
Generally, the minimum flange length should be at least equal to the material thickness plus the inside bend radius.
How do I specify hardware and welding?
Please indicate all hardware (PEM part numbers, thread sizes) and weld requirements (type, length, location) directly on your 2D drawings using standard symbols.
What are your typical lead times?
Prototypes: 1-2 weeks; Low to Mid-Volume Production: 2-4 weeks; High-Volume Production: 4+ weeks. Expedited services may be available upon request.